Files
tinker_tickets/models
jaredandClaude Sonnet 5 c892d9dcc8 Recompute next_run_at when re-enabling a paused recurring schedule (#89)
toggleActive() flipped is_active without touching next_run_at. If a
schedule was disabled while next_run_at was still in the future, then
re-enabled after that date had passed, the next cron tick saw
next_run_at <= NOW() and fired immediately — surprising for an admin
expecting a re-enabled "daily" schedule to wait until its next natural
occurrence. Now recomputes next_run_at from the current time when
transitioning to active, matching what a fresh schedule creation would
produce; disabling is unchanged.

Verified against a local MariaDB instance: re-enabling a schedule
whose next_run_at was in 2020 recomputed it to tomorrow at the
scheduled time; disabling leaves next_run_at untouched.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01MGDKHiU5RJdo3dqQUDow3X
2026-09-08 11:45:11 -04:00
..